We share our stories

news

TU Delft Award
March, 2025

On 11 March 2025 the 2024 Geothermal Thesis Awards ceremony took place at Delft University, faculty of Civil Engineering, department Applied Earth Science/ Geothermal Engineering. Spidron Weco BV is a proud sponsor of this highly valued award!

We congratulate the winner: -Paula Grzesiek, for her thesis entitled: 'Comparison off different integration options for High Temperature Aquifer Thermal Energy Storage (HT-ATES) System on TU Delft Campus’
More info on Linkedin

news
Mijnwater Energy HLH-GT-03
November 2023

Last November well HLH-GT-03 has successfully been drilled to an existing mining gallery for Mijnwater Energy BV. Spidron Weco BV proudly assisted Mijnwater in this project with well engineering and drilling management. We want to thank all service providers for their role in this beautiful project: Vito, Tacrom, Chemfor, Inco Drilling, Fangmann, Brandes, GeoService GmbH, Iteco, HP Well Screen, Trommelen Infra, LBP|Sight.

news
Haalbaarheidsstudie geothermie
December, 2021

For a Dutch Municipality Spidron Weco has investigated the potential use of geothermal energy in various residential areas in their municipality. During this study the possible link between heat demand and subsurface potential was investigated. Spidron Weco has coordinated and guided the inquiry and the (external) geological investigation. We have sketched conceptual well designs and surface infrastructure. The study provides useful data for the municipality where geothermal heat is a viable option for district heating.

news
Pompwissel Mijnwater Energy BV
November 2021

On behalf of Mijnwater Energy BV we recently performed the project management and supervision of the replacement of a downhole pump of one of their wells. This operation was executed very successfully, also thanks to the combined effort of Mijnwater and her suppliers.

news
Spidron Weco & ECW
October, 2020

Mohammed's site visit at ECW with Jan from Deep Drill.

news
Spidron Weco workover @ ECW
April, 2020

For ECW Geomanagement B.V. we recently managed and engineered a workover on a geothermal producer in Middenmeer. In the existing well, a coated inner string was installed using a hydraulic workover unit. This work was successfully done despite challenging Corona restrictions. With thanks to good teamwork from ECW Geomanagement, Well Gear, Baker Hughes, NOV Completion Solutions, DEW Wartungs- und Reparatur, Ruma Rubbers, Hunting, Odfjell, Baker Hughes, Mammoet, Stralingsupport, Deepdrill, Gebr. Alsumgeest, Cleanstream, and others.

Photo: ECW/Kenneth Stamp

Clients & Partners

hoeksche waard
dago
den haag
ecw
ebn
eneco
frisia
leeuwarden
mijnwater
rotterdam
vermillion
warmtestad
zwolle

Looking for experience and quality for your next project?